Which Pelton & Crane light spring assembly to order?
Which Pelton & Crane light spring assembly to order?
This is the Error Message
How to Install Low Voltage Control Box (DCI PN 2030)
Punch out a hole on the bottom or lower right side of the box for the equipment wires.
Connect the line input wires from the equipment (vacuum compressor, etc.) to the screws on the right side of the contactors. It does not matter which one goes on the top or bottom. Connect the ground from the equipment to the ground wire screw or another grounding source.
The PN 2030 low voltage control box is factory wired for 220-240 input voltage.
To convert from 220-240v to 110v-120v remove the spade terminal on the 240v tab and install it onto the 120v tab.
Which Pelton & Crane light spring assembly to order?
Inline Strainer Order Guide
Which Solids Collector Do You Need?
Identify Input Barb on DCI Holder Valves
Function of the different A-dec(R) Cartridges in Century Plus(R)
Helpful hints for installing a Pelton & Crane LF II light arm
Tuttnauer Power Switch Wiring Diagram
How to Install Low Voltage Control Box (DCI PN 2030)
How to Adjust DCI Flex Arm
Difference Between Non-Relieving & Self-Relieving Mini Regulators
Address
705 S. Springbrook Rd
Building C
Newberg, OR 97132
Call
(800) 624-2793
Quick Links
Company