DCI Flow Control Valve Adjustment
Support Video
This is the Error Message
How to Install Low Voltage Control Box (DCI PN 2030)
Punch out a hole on the bottom or lower right side of the box for the equipment wires.
Connect the line input wires from the equipment (vacuum compressor, etc.) to the screws on the right side of the contactors. It does not matter which one goes on the top or bottom. Connect the ground from the equipment to the ground wire screw or another grounding source.
The PN 2030 low voltage control box is factory wired for 220-240 input voltage.
To convert from 220-240v to 110v-120v remove the spade terminal on the 240v tab and install it onto the 120v tab.
Support Video
Support Video
Support Video
Support Video
Support Video
Support Video
Support Video
Potentiometer Test Procedure
How to install a Precision Comfort Syringe Button
Struggling to connect tubing with a barb?
Address
705 S. Springbrook Rd
Building C
Newberg, OR 97132
Call
(800) 624-2793
Quick Links
Company